国产m3u8在线观看-国产mba-国产mv日韩一区-国产mv天美传媒-国产mv在线观看免费-国产ol丝袜高

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 午夜99 | 国产在线精品9 | 最新免费电影 | 欧美日韩国产成 | 国产精品成熟 | 欧美亚洲一 | 国产妇女视频免费 | 精品偷拍无 | 91偶偶福利 | 国产激情影视在线 | 国产不卡在线观看 | 91丨熟女丨对白 | 国产欧美精品久 | 另类激情文学一 | 日韩精品极 | 日韩免费在线电影 | 欧美中文高清日韩 | 国产精品日韩一 | 日本不卡| 国产欧美精品二区 | 国产日韩欧美在线 | 欧美性猛交一 | 国产欧美视频日韩 | 97se国产在线 | 日韩欧美一区二 | www.日本高清| 欧美自拍无毒不卡 | 日本中文字幕乱码 | 绿巨人官网下载免费 | 91新福利在线观看 | 91午夜免费福利 | 国产欧美亚洲精品a | 国产精品伊人日日 | 国产成a人亚洲精∨ | 成人免费观看视 | 国产视频91九色 | 国产欧美日韩主播 | 97se狠狠狠狠狼 | 国产拍揄 | 欧美尤物在线一 | 欧美日韩激情视频 |