国产m3u8在线观看-国产mba-国产mv日韩一区-国产mv天美传媒-国产mv在线观看免费-国产ol丝袜高

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产一区二区三区在 | 国产在线看 | 91中文字幕 | 日本欧美影院 | 69精品人人人人 | 最新亚洲人成 | 国产精品网站 | 国产日韩欧美一区 | 国产精品一区99 | 日韩不卡中文字幕 | 日本中文字 | 日韩午夜理论 | 人成视频播放 | 九一香蕉| 国产岛国在线观看 | 91丨九色丨国产 | sss欧美一区二区 | 91热爆| 欧美日韩第三页 | 91啪在线视频| 欧美日韩在线免费 | 国产尤物在线 | 最新国产拍偷乱偷 | 国产人妖在线 | 九七电影网手机版 | 欧美亚洲性爱综 | 国产精品偷窥 | 欧美日韩在线播放 | 日韩哦欧美在线 | 国产精口| 日产精品 | 国产一区国产二区 | 午夜亚洲一区 | 欧美亚洲日韩 | 国产自在线91 | 欧美日韩一二三 | 国产乱轮精品一区 | 99这里只有精品 | 91国内精品在线 | 欧美一区视频在线 | 清纯唯美亚洲 |